Nanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant Project

This project is a power plant operating in Jiangsu Province, China. This project has a total capacity of 780 MW, largely driven by two sets of 390 MW gas-steam cogeneration systems. These aspects allow the estimated annual operation to reach 3,500 hours, supplying approximately 2,716,000 MWh of electricity. Additionally, this project benefits the local community by consuming 576 million m3 of gas emitted from the Chadamu and Tarim basins as well as the Shanganning region and reduces approximately 1,044,328 metric tons of CO2e per year.

Registry
LocationNanjing City, Jiangsu Province, China
Project TypeRenewables
Emission Reduction1,044,328
VerificationVERRA